Fire incidents are among the most relevant for people in a tunnel. Therefore, it is important to be sufficiently prepared for such events. A large scale fire test is to be used to help evaluate the initial burning duration and the time it takes for the fire to spread to other vehicles in the tunnel, and in particular how long it takes for a truck carrying wooden pallets to catch fire, taking into consideration the extremely high temperatures. The goal, therefore, is to determine the time it takes for a fire to spread to other vehicles in the tunnel. In the large scale fire test, an accident in a tunnel with one-way traffic is simulated between a truck loaded with approximately 3.7 t of wooden Europol pallets and a passenger car. Directly behind each of the vehicles involved in the accident there is another car which stops at a distance of 1.0 m. Approximately 300 litres of burning diesel are discharged from the truck's fuel tank, which is simulated by using approximately 400 litres of isopropanol. A 10 m-² burning pool forms underneath the truck. Other objectives of the large scale fire test are the validation of the CFD models and the evaluation of the progression of the thermal release ratios estimated for the simulation. The thermal release ratios generated in the test are determined and evaluated using various models.
Risk-based approach for the protection of land transport infrastructure against extreme rainfall
(2016)
The aim of the research project "Risk based approach for the protection of transport infrastructure against extreme rainfall RAINEX" is the development of a practical methodology for the identification and assessment of both vulnerable as well as critical transport infrastructures towards extreme rainfall events consequences. The developed methodology is based on expert knowledge and includes qualitative and semi-quantitative analyses regarding the assessment of the vulnerability and criticality of relevant transport infrastructures. The process chain from the spatial rainfall to the concentrated runoff in the river channel was shown to assess the local hazard resulting in the local risk. The main result of the project is a practice-oriented and applicable methodology and a comprehensive and well-developed security handbook.
The current maintenance management for bridges is mainly based on visual inspection and aims at the repair of identified damages. In the project cluster "Smart Bridge" an adaptive system for holistic evaluation in real time is developed. The following pilot studies show significant aspects of the Smart Bridge. Within the research project "Digital Test Area Autobahn" a new constructed prestressed concrete bridge is implemented with instrumented expansion joints and bearings, a "RTMS©" and a sensor network. By using analytical bridge models and evaluation methods the condition and reliability of the bridge as well as the remaining service life is determined. In the pilot study "duraBASt" sensors for the detection of durability and structural safety as well as data analyzing and evaluation procedures are investigated. The aim of this study is the partial implementation of the aspects: data collection, data processing and model development for condition assessment of the bridge.
The case study "Digital Test Area Autobahn" is presented. A new built (September 2016) pre-stressed concrete bridge is equipped with different monitoring systems for the detection of traffic load, climatic influence and the reaction of the bridge. Possibilities for the implementation of a VoI (Value of Information) analyses are presented.
In future, additional and more detailed data are needed about the current conditions of bridges for preventive maintenance management. Monitoring procedures are not merely able to provide key performance indicators for a specific point in time, but also over a period. These KPIs must be selected in such a way as to permit substantiated statements about the present and future condition of bridges. For this reason, greater efforts must be made to define the significant KPIs for the various types of bridges, and show how these figures can be reliably determined. Both the COST Action TU1402, and TU1406 offer important approaches which, properly combined, can deliver substantial added value to the calculation and description of the condition of bridges in the interest of proactive maintenance management.
Efficient and widely available transport infrastructure is one of the most important prerequisites for sustainable economic development to meet the demand for mobility. In this context, being able to manage traffic growth forecasts is of particular importance. In Germany, current forecasts indicate a 40% increase in rail and road transport in the country. However, about 60% of bridges (as measured by bridge area) on the national German highway system that are suitable for freight transport were built before 1985. In other transport sectors as well, aging infrastructure is one of the key challenges for the availability and the resilience of European transport infrastructure. Many bridges in the national German highway system are already at their load-bearing limit. Furthermore, required maintenance measures have not been adequately carried out in the past due to limited budgets, leading to overall bridge deterioration. Further challenges for owners and operators of transport infrastructure result from the effects of climate change, associated climate extremes, natural catastrophes, and possible criminal and terrorist threats. To ensure that future infrastructure challenges can be successfully addressed, strategies and solutions must be developed and implemented in a timely manner to enable holistic and sustainable life-cycle management. The concepts of Resilience Management as well as Resilience Engineering are essential building blocks in this process. Resilience is the ability to survive in the face of a complex, uncertain, and ever-changing future. It is a way of thinking about both short-term cycles and long-term trends. Using this concept, owners and operators can reduce the risk of disruption in the face of shocks and stresses. Resilience requires cyclical, proactive, and holistic risk management practices.
The field of safety in road tunnels has always been an important issue for operators, owners and the responsible authorities. After the tunnel accidents in 1999 the subject gained however in importance. On European level the Directive 2004/54 EC on "Minimum safety requirements for tunnels in the Trans European Road network" has been published. This guideline has to be implemented into national law by all Member States. According to the guideline all Member States of the European Community shall develop a methodology for risk analyses to be applied in certain cases. For Germany, a standardized methodology for a probabilistic quantitative risk assessment has been worked out.
A very high service availability is important for the operator and for the user of road tunnels, too. The service availability of a structure is directly related to its quality. The earlier quality assurance measures are being considered during the life cycle, the better a structure of high quality can be guaranteed. Problems which occur during the operation period of a structure often result from design errors or from inadequate realisation during the construction phase. They may also occur as a result of wrongly planned maintenance and refurbishment works. Thus, the transfer of specific data, information and experiences through the whole life cycle is very important. In this context methods of facility management can provide efficient assistance when they have already been used throughout all three classic phases of a structure's life cycle - planning, construction and operation. Finally the tunnel drainage system of German road tunnels is considered as an example as practical application possibility.
This paper deals with the determination of test criteria for the durability assessment of polyvinyl chloride (PVC)-based geosynthetic barriers (GBR-P) products in tunnel sealing systems. In the project different products for road tunnel application are investigated by systematic long time storage in hot water using a new test procedure based on SIA V 280 standard (test no. 13) and EN 14415. The objective of this research project is to derive suitable exposure conditions and criteria for a practical testing procedure with regard to service lifetimes of up to 100 years. For that test temperature and time as well as the best suitable test medium have been investigated in a structured way. To verify the results of the new test procedure the material properties of GBR-P samples removed from older road tunnels are investigated. Based on the presented results of the still on-going research program some preliminary conclusions regarding the updating of the German regulations for road tunnel sealing systems (ZTV-ING part 5 section 5 and TL/TP KDB) are given.
The Federal Highway Network of Germany represents considerable fixed assets. Construction and maintenance activities not only require a high budget, but also influence the traffic infrastructure and, thus, the economy and society as a whole. The present safety of the network has to be ensured under consideration of environmental aspects. At the same time the network owner has to make sure that the civil works are carried out in the most efficient way. Considering the fact that financial resources are restricted, the costs have to be spent in a way to obtain the greatest possible benefit. This task is supported by the application of a comprehensive Asset Management, which is subdivided into operational and controlling tasks respectively. The paper describes the current management procedures.